Testing Phase

Objective: Validate the HAR prototype for accuracy, safety, and efficiency.

Materials

Methods

  1. Test 100 W prototype for power output.
  2. Measure ballistic accuracy (target deviation <1 cm at 100 m).
  3. Verify thermal management (system temp <50°C).
  4. Scale tests to 500 W prototype.
  5. Document results for regulators.

Schematic

[Test Setup]
[HAR Prototype] --> [Ballistic Sensors]
       |
       v
[Power Meter: 100–500 W]
[Thermal Cameras] --> [Data Logger: MATLAB]
            
Next: Integration Phase